Client:
TEAM Engineering S.p.a. - Rome (IT)
Independent check of preliminary design of the bridge with 3 spans 70-110-70 m, and transversal box section.
Independent check of preliminary design of the bridge with 3 spans 70-110-70 m, and transversal box section.
Projects: Existing Bridges
Projects: New Bridges
Projects: New Bridges