Projects: New Bridges

Prestressed concrete bridge on Rio Utonde – Guinea

prestressed-concrete-bridge-rio-utonde-guinea

Client:
TEAM Engineering S.p.a. - Rome (IT)

Independent check of preliminary design of the bridge with 3 spans 70-110-70 m, and transversal box section.

Share:

Altri Progetti

FOOTBRIDGE 2022 – Madrid (Spain)

Carlo Margheriti has been present in september with Philip Icke of LUSAS, at Footbridge 2022 Conference in Madrid to expand network of partners distributing/reselling PontiEC4,

Contattaci